9. Southwest corner (inside addition)
9. Stucco covers the south wall. This was apparently performed before the addition. The lower casement windows are filled in, as are most of the upper casement windows. One unfilled upper casement window has been removed and replaced with metal door.
Not to be reproduced without permission of AZ Historical Research.